Re: F-35 Budget update


Message posted by JoenTX on March 30, 2012 at 19:15:12 PST:

Last I read, the UK MOD was on the verge of reconsidering the move to the -C (CTOL naval version) and once again looking at the VTOL -B version. Apparently the cost of converting the VTOL configured decks to a conventional lay out (and associated cost of EMALs) was approaching that of just sticking with the -B and leaving the deck design in the original form.


In Reply to: Re: F-35 Budget update posted by Gimbal on March 30, 2012 at 8:51:40 PST:

Replies:



[ Discussion Forum Index ] [ FAQ ]