Re: Regarding the wide load on the ET Hwy-


Message posted by Msradell on July 22, 2009 at 7:15:06 PST:

Hydroelectric turbines aren't interchangeable between dams. They're very specifically designed for the flow and head pressure of each dam. It could be a turbine being taken some place to be refurbished but I would have thought we would have seen that at the dam site because removing one is a major project!


In Reply to: Regarding the wide load on the ET Hwy- posted by JoenTX on July 21, 2009 at 21:22:57 PST: