Re: Exclusive photos of Station 700 between Area 51 and the NTS


Message posted by Joerg (Webmaster) on January 23, 2009 at 10:46:40 PST:

The concrete materials currently being hauled into Area 51 could be needed, at least in part, for a re-surfacing of the runways and/or taxiways as well as the Janet ramp. Apparently the ramp of the Las Vegas Janet terminal is being re-surfaced at the moment as well, to support the weight of the new Jannet 737-600's. I imaging the same would be required on the other end.

I am sure our new satellite photo that we will present at the August Area 51 conference (see attached link) will tell us more about the increased construction activity at Groom. The satellite photo will also show, for the first time, the finished new hangar SE of hangars 9-16.

Attached link: Area51 - The Dreamland Conference

In Reply to: Exclusive photos of Station 700 between Area 51 and the NTS posted by Joerg (Webmaster) on January 16, 2009 at 10:58:56 PST:

Replies:



[ Discussion Forum Index ] [ FAQ ]